Run Painting from estimate through closeout
Keep surfaces, selections, evidence, changes, punch work, products, and customer acknowledgement connected.
1
Build named room, elevation, and component groups and have a person verify area, deductions, coats, and inputs.
2
Resolve product compatibility, safety, local requirements, and exact color/surface selections before marking the estimate ready.
3
After acceptance, capture evidence and progress against the approved surface list; use change control for added surfaces, coats, products, access, or concealed repair.
4
Reconcile product batches and leftovers, verify every punch item, create the closeout packet, then send its private acknowledgement link.